State Regulators & Reliability Reports

Pennsylvania

Overview

Regulator:
Pennsylvania Public Utility Commission (PAPUC)

Authority:
Pennsylvania Code, 52 Pa. Code § 57 Subchapter N, “Electric Reliability Standards,” especially § 57.195, “Reporting Requirements”

Customers Served (2022)
6,250,115

Electric Sales, MWh (2022)
145,044,592

SAIDI Minutes (2022)
200

SAIFI Frequency (2022)
1.14

Other Relevant Reports:
PAPUC produces annual reports that summarize utility reliability performance for the previous year, detail trends in state-wide reliability data, and review major outage events.

Reporting Requirements

Current Requirements:
Regulated utilities must report yearly SAIDI, SAIFI, CAIDI, and MAIFI (if available) index calculations annually and quarterly, on a system-wide basis. Calculations diverge from the IEEE Standard 1366 by using (a) an alternative means to TMED for determining Major Events, and by (b) not being reported with Major Events both included and excluded. (As a result, some utilities report “IEEE SAIFI” alongside “PUC SAIFI” figures.) Each annual report must also summarize all interruption data by cause (not within an index), with cause classification at the discretion of the utility. Large utilities (100,000+ customers) must also identify their top 5% worst-performing circuits. Quarterly reports provide the same yearly index calculations, on a “rolling 12-month” basis; large utilities must report the same for worst-performing circuits and interruption causes.

Additionally, utilities must meet performance “standards” and “benchmarks” for SAIDI, SAIFI, CAIDI, and MAIFI, which are based on historical performance and set by the PAPUC for each utility. Compliance is measured against rolling 3-year and 12-month averages. Failure to meet index standards may result in PAPUC investigations, additional reporting requirements, fines/penalties, or other corrective actions.

Utility achievement of reliability index standards and benchmarks is also a component of Long-Term Infrastructure Improvement Plans, which, after PAPUC approval, may allow a utility to recover select costs from distribution system improvements and/or repairs (66 Pa. C.S. § 1352–1353).

Required Indices:
SAIDI, SAIFI, CAIDI

Alternative Indices:
MAIFI data must be reported, if available

Effective Year of Current Requirements: 2004

Availability

Summary:
Utility reliability reports are readily accessible online in PDF format.

Reporting Period:
Annual; Quarterly

Example Utility Report:
PPL Electric, CY2022

How to Access:
Annual and quarterly reports dating to 2009 are available here; under “Document Type,” select “Reliability Report” or “Reliability Report (Quarterly).” Some quarterly reports may appear in both searches.

Other Requirements